Do you supply complete optical instruments or design the optics?+
OUJI manufactures custom mechanical parts to approved customer drawings. Optical design, electronics design, fiber termination, optical alignment and instrument performance validation remain with your team. Send the mechanical drawing for a manufacturability review.
Can you make one prototype before a production order?+
Ordinary CNC milling and turning samples can start at one piece, subject to drawing review. The minimum sample order for Swiss-type and micro machining is 100 pieces. Single-piece sample orders are not available for this service. Include your prototype and expected production quantities so each stage can be quoted.
How long do production and delivery take?+
Qualified simple CNC parts may start from 3 business days. Standard parts without heat treatment can dispatch within 14 business days after drawing approval and technical confirmation. These CNC planning ranges are not a blanket Swiss-machining or finished photonics assembly lead time. Quantity, stock, finishing, inspection and transit affect delivery; the quotation confirms your schedule.
What tolerances can you hold on optical equipment parts?+
Selected critical features can be reviewed to ±0.005 mm. This is not a tolerance for every feature: material, geometry, workholding, finish and the measurement method determine feasibility. State fit, runout, position and surface requirements separately, including whether acceptance is before or after finishing.
Can you handle anodizing, plating and masked surfaces?+
Yes. OUJI coordinates anodizing and plating with specialist partners and reviews the finished parts against the agreed scope. Specify coating type, thickness, color, masking and final dimensions. Optical reflectance, vacuum compatibility and special cleanliness requirements need separate feasibility and verification agreements.
Can I request FAI, material traceability and compliance documents?+
Yes. Agree first article inspection (FAI), measured dimensions, sampling, material certificates and lot traceability during quotation. State your required certificate format and any RoHS or REACH documentation requirements before material and finish selection. Additional reports, including full-dimensional reports, are charged only for the personnel time needed to record results and prepare the documentation. Allow up to approximately one additional day for this reporting work. The scope and delivery date are confirmed during quotation. External testing and specialist-process schedules are quoted separately.
Is OUJI ISO 9001 certified?+
OUJI is not currently ISO 9001 certified. Projects are managed through drawing review, in-house process planning, production follow-up, inspection coordination, documentation review, and corrective action. Project-specific reports and certificates should be confirmed before production.
What do you need for a quote, and how quickly will you reply?+
Send the 2D drawing and 3D model, revision, material, quantity, finish, inspection requirements and target delivery date. Receive a quotation or technical clarification within 12 hours of sending complete drawings and requirements. Complex features and outside processes may need further review before final pricing. An NDA can be arranged before you share sensitive drawings. Production, shipping terms and delivery timing are confirmed in the quotation.