OJTECH — OUJI Industrial Technology
EN

Engineering plastic / CNC MATERIALS

PEI / Ultem CNC Machining

Also known as: Polyetherimide

Machined PEI components to the specified formulation, including Ultem 1000 and 2300 requirements for review.

CNC milling & turning · Drawing-based orders

Ultem 1000 or 2300: is reinforcement part of the drawing?

Keep the full PEI formulation. Unfilled Ultem 1000 and glass-filled grades such as 2300 should not share one generic strength, appearance or compliance claim. Quote the actual machinable stock and required documentation; the brand name is only one part of the specification.

01 / MATERIAL SPECIFICATION

PEI / Ultem grades & conditions.

Match the full designation on your drawing. Frequent machining experience, published project evidence and specifications for review are shown separately.

Material grades and order requirements
Grade / designationExperienceInclude with your drawingInquiry
Ultem 1000Specify for reviewUltem 1000: identify the unfilled PEI stock grade and any mandatory manufacturer documentation.Quote grade ↗
Ultem 2100Specify for reviewUltem 2100: preserve the 10% glass-filled designation and the required stock form.Quote grade ↗
Ultem 2300Specify for reviewUltem 2300: retain the 30% glass-filled formulation and identify orientation-sensitive dimensions.Quote grade ↗
Static-dissipative PEISpecify for reviewStatic-dissipative PEI: specify the manufacturer product and electrical acceptance range and test conditions.Quote grade ↗

Listed grades do not imply current inventory. Material condition, stock form and documentation are agreed with the quotation.

02 / MACHINING REQUIREMENTS

Make the drawing ready for review.

Focus on the details that change material purchasing, the machining route and finished-part acceptance.

01

Stock grade versus resin designation

Confirm the datasheet applies to the rod or plate being supplied. A molding-resin document should not silently replace the specification for a machined stock shape.

02

Thin sections and residual stress

Show slender walls and deep material removal. Include any specified conditioning or stress-relief step and identify when final dimensional inspection should occur.

03

Electrical and fire requirements

Where the buyer requires electrical behavior or a flammability rating, give the test basis and documented product grade. A general PEI characteristic is not finished-assembly approval.

PROCUREMENT QUESTIONS

Before you send the RFQ.

Inspection & quality records ↗
Does “Ultem” identify a single machining material?

No. Keep the grade number and reinforcement in the purchase specification. Unfilled, glass-filled and static-dissipative products need their own stock and property review.

Can PEI use the same thermal limit as PEEK?

Use the manufacturer data for the selected PEI formulation and the relevant test or service condition. A temperature published for a PEEK product cannot establish the acceptance limit for PEI.

DRAWING TO QUOTATION

Have a material on your drawing?

Send the drawing and quantity. We’ll review the material, machining route, finish and inspection requirements together.

Response within 24 hours of receiving complete project details.

Start with what you have.

Details already in your drawing do not need to be repeated. If a material is undecided, tell us what the part needs to do.

Open the full request form ↗
See our inspection approach ↗

Optional details from your material selection. Edit or clear them before sending.

Tell us the part and quantity you need. Add material or delivery requirements if known; details already in your drawings do not need to be repeated.

    For quotation and manufacturing review only.Your selected files are sent securely only after you submit this RFQ.

    Protected by Cloudflare Turnstile. Prefer email? Send your drawings to info@ouji-tech.com.

    By submitting this form, you agree that OUJI may use the information and files provided to respond to your request, as described in our Privacy Policy.